← Business And Income Project · source: files/project-5-crm-build-plan-2026-11-28.md

business-and-income-projectresearchscripts

Project 5 — Dun's CRM: The Build Plan

Approved for planning by Dun, 2026-11-28: "Let's plan this. This is project five CRM build project." Sources: the GHL backbone blueprint (gohighlevel-backbone-replica-2026-11-28.md), the agent-run design (agent-crm-research-2026-11-28.md), and the builder comparison (ai-builder-comparison-2026-11-28.md).

What this plan builds: GoHighLevel's backbone — one contact record, three pipelines, trigger→action flow — rebuilt in Dun's own stack, run by agents, with Simon as the interface and a morning briefing instead of a dashboard. Nothing in this plan is a subscription.


1. How it gets built

2. The stages

Stage 0 — Verification pass (decisions week, Nov 30–Dec 6) Simon takes GoHighLevel's free trial and clicks through the live product, verifying the documented behavior firsthand before any spec is written from it — the ~20 mapped components, checked against the real thing. Discrepancies get logged into the spec pack. - Dun: present for the sign-up (~15 min). The trial needs his details; no card commitment beyond what the trial itself requires, and nothing converts to paid without his word. - Test: a verification note per component — confirmed, or corrected from live behavior. Nothing enters the spec as "documented" that the live product contradicts. - Fallback: if the trial is blocked or unusable, the spec is written from the docs and API reference alone, with unverified items marked as such.

Stage 1 — The spec pack (decisions week) One behavior spec per component, written from the blueprint + the trial notes + GHL's public API reference (every function, inputs, outputs, triggers). This is the document Claude Code builds from and Simon tests against. - Dun: one approval of the pack (~20 min). - Test: every blueprint component has a spec stating what goes in, what comes out, and what fires when — readable by Dun in plain language. - Fallback: gaps stay marked; only specced pieces get built.

Stage 2 — The store Cloudflare D1 on Dun's own account. Five tables — contacts, opportunities, events, tasks, values — behind one access layer every agent uses. Seeded with the existing practice-run prospects. A Sheets mirror exists for Dun's eyeballs; it is a view, never the store. - Who: Simon leads; Claude Code builds the schema + access endpoint to spec; Simon integrates and tests. - Dun: ~10 min — open the mirror, see his contacts. - Test: a test contact written through the access layer is read back from a separate session, its event is in the log, and a full export runs. The store is true before anything is automatic. - Fallback: Supabase hosts the same five tables (the design is portable by construction).

Stage 3 — Command Center skeleton The read view in the Web Space, generated from the store: contacts table, three pipeline boards, task queue, follow-up calendar. Looks like regular CRM software on purpose. Read-only at this stage. - Dun: ~10 min play-test on his phone. - Test: Dun finds a named test contact unaided, fast, and every number on screen matches the store exactly. - Fallback: the Sheets mirror serves as the window until it passes.

Stage 4 — Capture + Qualify agents The Claim gate writes to the store automatically. Capture creates the contact, tags source + service, dedupes, sends the pre-approved acknowledgment, opens the opportunity at New. Qualify tallies the engagement score, pre-fills the assessment file, marks hot leads (score ≥ 4) for the briefing and Needs Dun. Accepting anyone into the paid assessment stays Dun's gate. - Dun: ~15 min — approve the acknowledgment template; run one test claim himself. - Test: Dun's own test claim lands in the store, scored, acknowledged in his inbox, inside the hour. Then the same test against the practice-run prospects. - Fallback: Simon processes submissions by hand, same day — which is Stage 2's normal mode anyway.

Stage 5 — Booking + Follow-Up agents Booking works Dun's real Google Calendar availability, attaches the prospect's file to the event, sends confirmation and reminders. Follow-Up runs the Day 0/3/7/14/21 sequence from templates Dun approves once, stops the moment a human replies, and makes one no-show recovery attempt. Non-template messages wait for Dun — the gate is structural, in the task queue, not a promise. - Dun: ~20 min — approve the template set; run one test booking end to end. - Test: a test booking produces the calendar event with the file attached; reminders fire; a simulated no-show triggers recovery; a reply halts the sequence. - Fallback: Simon books and follows up by hand from the same templates.

Stage 6 — Morning briefing live + Command Center full The Briefing Agent reads the store and the event log and delivers the six-section briefing (§3.8 of the research): overnight leads, pipeline movement, who needs follow-up today, today's plate, stalls and red items, the money line. Spoken first, ~2 minutes; a table only when Dun asks. The Command Center gains its narrow edits (move a card, add a note, approve a queued task) — every edit writes through the access layer into the event log. - Dun: ~15 min — hear the first real briefing, correct it; make one edit in the Command Center. - Test: three facts in the briefing are spot-checked against the store and match; Dun's edit appears in the event log and in the next briefing. - Fallback: Simon delivers the briefing by hand from the store — he already delivers a morning report — while the generator is fixed.

Stage 7 — Payment + Hygiene agents (at the first paying pilot, not before) Stripe events wired: payment moves the card to Won, starts the service's kit checklist, opens the client workspace. Hygiene runs nightly: duplicates merged, stale cards (14 days, no touch) flagged, one data-quality line in the briefing. Refunds and price changes always ask Dun first. - Dun: ~10 min — approve a live test of the payment flow. - Test: a real payment on the pilot moves the card, starts the checklist, and shows in the money line the next morning. - Fallback: Simon tracks payments from Stripe notifications by hand. Deliberately last either way: no money automation before real money exists.

3. December — the calendar reality

~4.5 weeks from now to January 1. Dun is unavailable for roughly 1–1.5 of them. The build is Simon-side work; Dun's minutes (§4) are approvals and play-tests that batch — nothing in the stages needs Dun and Simon in the room except the Stage 0 sign-up.

The readiness rule (Dun's, stated 2026-11-28): January 1 stays as the target because it pushes the work. It is not a promise. We do not launch unready — readiness beats the date. If a stage is red on Dec 31, the launch moves or that piece is rented; it does not ship broken.

4. Dun's time — the whole bill

Approvals and play-tests only. No building, no configuring, no debugging — that is Simon's side of the desk.

Stage Dun's minutes
0 · Verification (sign-up) ~15
1 · Spec pack approval ~20
2 · Store (look at the mirror) ~10
3 · Command Center play-test ~10
4 · Capture + Qualify (template + test claim) ~15
5 · Booking + Follow-Up (templates + test booking) ~20
6 · Briefing + Command Center (listen, correct, one edit) ~15
7 · Payment flow approval (at the pilot) ~10
Total ~115 minutes — under 2 hours, all December

5. Vertical Snapshots — the same engine, per industry

Once Dun's own machine runs, it becomes a product. GoHighLevel's multiplier is the Snapshot: a whole setup cloned into the next account — the setup, never the contacts. Dun's version: the same engine, reconfigured per client industry. This is also exactly the shape of his existing Efficiency industry briefs — the vertical knowledge is already written; the snapshot is where it becomes a running machine.

What stays constant in every vertical: the D1 store and its five tables · the seven agents · the pipeline stage skeleton · the approval gates · Stripe payments · the morning briefing format · the Command Center. The engine does not change.

What changes per vertical — configuration only: stage names and steps · contact fields · follow-up sequence content and timing · booking rules · review-request timing · the fulfillment kit and checklists.

The worked example — a nail salon: - Booking: by technician, not by shop — a calendar per tech, with the service menu as products carrying duration and price, so a booking knows what it is and how long it takes. - Follow-up: rebooking reminders on the salon's real cycle — 2–3 weeks, the fill-and-gel rhythm — sent before the client drifts, not after. - No-shows: the salon's deposit rule applied, one recovery message, the slot released. - Reviews: the request lands right after the appointment, while the nails are still fresh. - Same Capture, Booking, Follow-Up, and Hygiene agents — Hygiene now also watches for regulars who have missed their cycle. Not one line of the engine is rebuilt; the agents are handed different rules, fields, and words.

What this means commercially: the CRM stops being Dun's back office and becomes a deliverable inside the Efficiency and Growth offers — the client is not buying software, they are buying Dun's configured machine for their industry. Each new vertical is configuration + verification work — days of Simon-side work, tested the same way as every stage — not a rebuild. The industry briefs are the source documents for each configuration. And the standing rule holds: a vertical gets configured when a client in that industry is live, not speculatively.

6. What is NOT in this build

From the blueprint's skip list — GoHighLevel features Dun's business does not use:

Revisit triggers — the two conditions that reopen the rent decision: 1. 5+ simultaneous clients wanting their own logins → rent GoHighLevel Unlimited; this blueprint is the migration map. 2. SMS becomes a daily channel → Twilio + A2P 10DLC registration, wired into the same agents.

7. The decision, reframed

Decisions week no longer asks "rent or build?" in the abstract. Dun approves or rejects this plan.

Either way, the decision stops being a gate the week it is made. What Dun is actually approving is not a technology — it is the sequence above, the ~2 hours of his time in it, and the readiness rule that protects January 1.