Getting the Ganim Model onto Dun's Platform — Implementation Plan

Date: 2026-11-28. Basis: verified Ganim teardown + Simon's review of ChatGPT's analysis (ganim-chatgpt-feedback-review-2026-11-28.md). Scope: fulfillment upgrade to the existing services. No new product, no change to the Jan 1, 2027 launch scope.

What "on our platform" consists of — 6 components

  1. Snapshot quiz (free front door) — spec DONE 2026-11-27, format adopted by Dun. Not built.
  2. Application gate (his 5-question form, adapted to the 10 Efficiency categories) — content to draft; runs on the website form flow (FormSubmit → simon89@muse.ai, already live and tested on the V3.4 preview).
  3. Interview system — 45-min recorded call: question bank (his Seven-Point Inspection × our 10 categories) + the close script (his 3 questions). Documents to draft.
  4. Analysis system — transcript → Claude prompt producing Impact × Effort scores, ROI with stated realization factor, findings mapped to the 10 categories. Prompt + scoring sheet to draft.
  5. Deliverable — 9-slide presentation deck in Dun's branding (his structure, our depth behind it: full report unchanged) + review-call flow. Deck template to build.
  6. Retainer (bounded Concierge shape) — offer definition: 2 working calls/mo, one workflow at a time, async access with stated response window, client hub logging everything built. Offer doc to draft; hub tool depends on CRM decision.

Sequence

Phase 1 — Build the paper system (no decisions needed; Simon drafts, Dun approves)

Phase 2 — Decisions that gate the build (Dun, decisions week Nov 30–Dec 6)

Phase 3 — Stage it on the preview (production untouched)

Phase 4 — Pilot, then launch

What already exists (no rebuild)

What this plan deliberately does NOT do