Job First (working name, chosen by Dun 2026-11-14 — "Let's call it Job First," a name to go back to; not yet name-checked for conflicts) — Change Order Capture, Version 1 Spec

Owner: Dun Chau · Business and income project · Drafted 2026-11-14 at Dun's instruction: skip contractor validation interviews (Dun does not know five contractors offhand to ask); proceed on stated industry-practice assumptions and build it.

Assumptions (from industry research, 2026-11-14 — to be replaced by real user data later)

  1. Target user: solo or small contractor firm (under 5 employees — two in three U.S. construction establishments are this size); the owner is operator, estimator, and office in one person.
  2. Typical job: residential remodel/repair, roughly $25,000–$150,000; change orders normally run about 8–14% of contract value, several per job, usually small ($200–$2,500 each).
  3. Loss pattern: industry sources cite ~9–13% of project revenue lost to unbilled or underbilled change orders, mostly verbal approvals never formalized. A change order is only complete with scope + price + signature + billing date.
  4. Behavior: approvals happen verbally, on site or by phone, while hands are busy. The contractor will not type a form in that moment; a ~20-second voice dictation is the maximum friction he will accept.
  5. Client behavior: clients approve fastest from a text link on their own phone — tap to view, tap to approve/sign. No client app install, no client account.
  6. Rule enforced by the product: no signature, no work. Work stays marked "waiting" until approval is recorded.
  7. Billing: change orders must be billed when the changed work is completed, not bundled into a final invoice weeks later.
  8. Legal/compliance: Florida is two-party consent for recording calls. The compliant core is the contractor's OWN after-the-fact voice dictation, plus the client's explicit tap-approval. Secret call recording is not a feature.
  9. Price test point: $49/month flat for a solo operator (incumbents bundle change orders in suites at $49–$449/month; narrow voice-first tool prices below them).
  10. Market: 944,223 U.S. construction establishments (BLS 2025), 592,340 specialty trade; plus ~2.9M self-employed construction businesses.

Core (stable, shared with Dun's call-capture design)

Version 1 module — Change Orders

  1. Capture: one tap, speak ~20 seconds (job, what changed, price or not-to-exceed, days added). App drafts the change-order card: scope, price, schedule impact, date/time, who verbally approved.
  2. Approval: one tap sends the client a link by text; client views scope+price and approves with a tap/signature on their phone. Status flips orange → approved.
  3. File: approved card is locked to the job record and the client contact timeline, with timestamp.
  4. Read back: tap any change order → it dictates back what was approved, when, by whom, for how much.
  5. Bill prompt: when the changed work is marked done, the app prompts to invoice that change order immediately and tracks billed vs unbilled totals per job (the "leak meter": total approved-but-unbilled dollars visible on the job).

Later modules (not V1)

Form

Web-based (no app store), modular core + modules, onboard by one link — same architecture as Fun World, per Dun's standing model.